Mumbai Metro

Mumbai Metro – Information, Map & Updates

Introduction

The Mumbai Metro system is an urban Mass Rapid Transit System (MRTS) serving Maharashtra’s capital. Its development has been entrusted to the Mumbai Metropolitan Region Development Authority (MMRDA), who in 2004 came out with a 146.5 km master plan with multiple lines. Due to various issues which range from policy paralysis to environmental issues, the MMRDA has so far only been able to implement 1 metro line to connect Versova in the western suburbs with Ghatkopar in the eastern suburbs. In 2015, a new 118 km master plan was approved and the new government has provided much needed impetus for the development of 2 lines (Dahisar E – Andheri E & Dahisar – D.N. Nagar) in addition to the upcoming Colaba-SEEPZ line.

Key Figures

Operational: 11.4 km | Under Construction: 68.2 km | Approved: 55.82 km | Proposed: 38.5 km
Note: The MMRDA has not fixed line colors yet.
Operational• Line-1: Versova – Andheri – Ghatkopar – 11.4 km
Executed & operated by a JV of Reliance Infra (69%), MMRDA (26%) & Veolia Transport (5%)
Stations: Versova, D.N. Nagar, Azad Nagar, Andheri, Western Express Highway (WEH), Chakala, Airport Road, Marol Naka, Saki Naka, Asalpha, Jagruti Nagar, Ghatkopar
Under Construction• Line-2A: Dahisar (E) – D.N. Nagar – 18.6 km
This line is part of the larger 40 km line between Dahisar & Mankhurd
Line 2B will link DN Nagar with Mankhurd (23.5 km)
• Line 3: Colaba – BKC – SEEPZ –  33.5 km
To be executed & operated by Mumbai Metro Rail Corporation Ltd – GOI (50%) & GoMH (50%)
• Line-7: Dahisar (E) – Andheri (E) – 16.5 km
In the future, this line will be extended to Mira-Bhayander in the north (Line-9) and to CSI Airport’s Terminal-1 & further to Bandra (E) in the south (Line-10)
To be executed by the Mumbai Metropolitan Region Development Authority
Approved• Line-2B: D.N. Nagar – Mankhurd – 23.5 km
This line is part of the larger 40 km line between Dahisar & Mankhurd
• Line-4: Wadala – Ghatkopar – Thane – Kasarvadavali – 32.32 km
To be executed by the Mumbai Metropolitan Region Development Authority
In the future, this line is expected to be extended to the GPO (CST) & possibly onward to Apollo Bunder in South Mumbai as part of Line-8
Proposed (not yet approved by State Government)
 Line-5: Thane – Bhiwandi – Kalyan – 24 km
• Line-6: Lokhandwala – Jogeshwari – Kanjurmarg – 14.5 km
To be executed by the Mumbai Metro Rail Corporation Ltd

Operational Network

The embedded maps below can be zoomed into!

Future Network:

History – Key Dates

08 June 2014: Versova – Andheri – Ghatkopar (Line-1) – 11.4 km
…..more to be added in 2020! Click on ‘Construction Updates’ below to view updates.